The first stage of plumbing is the planning and design phase, where the plumbing contractor assesses the needs of the construction project and designs a plumbing system that meets those needs. This phase involves collaboration with the project owner, architect, and other stakeholders, as well as obtaining necessary permits and approvals from local authorities.

Once the planning and design phase is complete, we move on to the installation phase. This involves laying out the plumbing system, installing pipes, fittings, and fixtures, and connecting the system to the main water supply and sewage lines.

After the plumbing system has been installed, the next stage is the testing and inspection phase. This involves conducting pressure tests and leak tests to ensure that the system is functioning correctly and that there are no leaks or other issues that could cause problems down the line.

Once testing and inspection are complete, the final stage of the plumbing services process is commissioning. This involves putting the plumbing system into operation and verifying that it is working as intended. We will typically provide training to building owners and operators on how to operate and maintain the system, as well as providing ongoing support and maintenance as needed.

Overall, the process of plumbing services is a complex and detailed effort that requires collaboration between various stakeholders and a commitment to quality and customer satisfaction. A successful plumbing project requires careful planning, skilled installation, thorough testing and inspection, and ongoing support and maintenance to ensure the system functions correctly over the long term.